Free Shipping on ALL Fireplace Doors

Majestic Fireplace Door For NVBC42 | NVSC42 | NVSR42 In Matte Black

Write a review
$51900
Available

+
Compare

 

Goods of the Woods 72” x 36” Canyon Black Half-Round Hearth Rug

$122.00

Shepherds Hook II Fireplace Tool Set In Black Finish

$215.00

The Nightwell for prefab fireplaces with a subtle matte black finish lends itself to be a great upgrade for any Majestic fireplace door is made for the model NVBC42 | NVSC42 | NVSR42. This door will not work on any other Majestic Prefab Fireplace. This custom fireplace door is crafted from sturdy extruded aluminum, and while the frame is slim, frame is heat resistant and durable. The trackless bi-fold doors with clear tempered safety glass offer a clear and ample viewing area as well. This inside fit zero clearance fireplace door comes with simplicity style handles for easy opening and closing of the doors. Mounting hardware is included for easy installation!

Installation: H for Hope You Are Handy!

  • Fireplace door installation requires power tools. You will need a pencil, 1/16” Drill Bit, Power Drill and a Phillips head Screwdriver.
  • Place new door carefully into fireplace opening and use the pencil to mark hole location through inside of the door frame.
  • Remove door from opening and use the power drill and 1/16” drill bit to drill holes through the sheet metal of the metal firebox.
  • Place door back into fireplace opening and use screws and screwdriver to finish installation. DON'T forget to peel off protective plastic.
  • Self tapping screws are provided and eliminates the need for pre-drilling. Be careful when using a power drill, to avoid slipping of the screw heads and damaging the fireplace door!

Arlington Zero Clearance Fireplace Door Specifications Product Specifications:

  • Fireplace Type: Prefab Wood Fireplaces or Prefab Wood Fireplaces Converted To Vented Gas Logs
  • Door Fit: Inside 
  • Finish: Matte Black Powdercoat
  • Approximate Recessed Depth: 1" 
  • Door Type: Trackless Bi-Fold Doors
  • Material: 1" Wide x 3/4" Deep Extruded Aluminum Frame
  • Glass: 3/16" Tempered Safety Glass
  • Glass Tints: Clear 
  • Ceramic Glass: N/A
  • Mesh Screen: Not Included
  • Handle Style: Simplicity 
  • Damper: N/A
  • Airtight Option: N/A
  • Assembly: Comes Fully Assembled
  • Mounting: Hardware Included

Arlington Zero Clearance Fireplace Door Manuals Product Manuals: 

How To Install Fireplace Door  

Manufacturer's Warranty

Manufacturer warrants the glass enclosures to be free from defects in material and workmanship for a period of one (1) year from the date of installation. Manufacturer warrants the metal work (exclusive of the finish) contained in the glass enclosures to be free from defects in the materials and workmanship for a period of two (2) years from the date of installation. Discoloration of any frame piece is caused by over firing and is considered abuse of the enclosure.

MANUFACTURER MAKES NO WARRANTIES AS TO A MAXIMUM TEMPERATURE AND STRESS WHICH MAY CAUSE GLASS BREAKAGE. LIFETIME WARRANTY ON GLASS.
Manufacturer will, however, replace without cost any glass that breaks in normal use. Manufacturer will cover shipping cost for replacement glass for a period of one (1) year from the date of installation. Warranties also are not transferable to new owners.  The foregoing limited warranty is not transferable by the customer and does not include the eventual defects caused by improper use or operation of the glass enclosure or by normal wear and tear. Manufacturer agrees that if the glass enclosure is determined to be defective in manufacture within the applicable written guarantee period set forth above, and the customer provides a written notice of such defects within fourteen (14) days of the end of such period to the customer’s local dealer, Manufacturer is limited to defects in manufacture, and Manufacturer shall not be responsible if the glass enclosure has not been used at all times with reasonable care and in accordance with the instructions which accompany each glass enclosure, and/or if any attempt has been made by any person other than Manufacturer or its authorized agents to repair, alter or otherwise interfere with the foregoing undertaking of Manufacturer is limited to the replacement of any determined by Manufacturer to be defective.
Finally, the enforceability of this limited Warranty shall be further subject to compliance with the following requirements:
A. That the customer complies with the instruction set forth above and does not misuse, abuse, alter, or modify the glass enclosure.
B. That the customer does not use the glass enclosure for a purpose other than its intended use.

DISCLAIMER
The limited warranty set forth above, is expressly in lieu of any other warranties, express or implied, including without limitation any warranty of merchantability or fitness for particular purpose, whether express or implied, and lieu of any other obligation or liability on the part of Manufacturer. Whether under theories of contract, tort or negligence, Manufacturer, shall have no liability for any consequential, incidental or special damages by reason of any act or omission, whether negligent or not, arising out of or in connection with the glass enclosure or its sale, delivery, installation, maintenance, operation, performance, or use, including without limitation any loss of use, damage to associated property or the facility, or any other similar and dissimilar losses, cost.

PLEASE NOTE:
Fireplace doors are hand crafted to the specifications of each order. Due to the nature of the anodization process on aluminum doors, and the plating/powder coating process on steel doors, slight variations in color may occur and will not be considered a warranty issue.

5
5 out of 5
Reviews: 1
5 stars
100%
4 stars
0%
3 stars
0%
2 stars
0%
1 star
0%
Jacqueline E.
5
Comment
Thank you Fireplace Doors Online. We are thrilled with the quality of your product and thanks to your recommendation, it fits perfectly in our very old fireplace. We wouldn’t hesitate to recommend your company.
~The Edgington’s
Questions
Products You May Be Interested In
  • Most Popular
  • On Sale
  • Recently Viewed
 
Fast and Reliable Shipping

Free Shipping on ALL Fireplace Doors

Trusted Quality and Expertise

We stand behind every product we sell with expert support and proven performance

Premium Packaging

Your order is packaged to meet the highest standards